How ACORN Helped Supply a Heavy-Duty Slewing Ring for Critical Fabrication
When a UK-based steel fabrication company took on an urgent order for a major client, they hit an immediate roadblock
When a UK-based steel fabrication company took on an urgent order for a major client, they hit an immediate roadblock
When a national beverage bottling plant faced a critical breakdown due to an overheating servomotor and gearbox, they were looking at a worst-case scenario, at least a week of downtime and a staggering cost of £10,000 per hour.
When Business Development Manager Jay Goodgame visited a local quarry, he quickly realised an urgent breakdown situation was unfolding at another site nearby. An engineer was struggling to source an SNR bearing at a fair price but with no luck.
When a critical pump was out of action for a leading UK pump rental company, extended downtime meant money lost
During a routine visit to a national food manufacturer on the Wirral, Business Development Manager, Lee Dobson was approached by an Engineering Manager regarding a critical issue affecting production
When a specialist 6" Renold coupling failed, an established pump, motor, and gearbox repairer needed a fast and effective solution to stay ahead of their competitors.
A leading FMCG (Fast Moving Consumer Goods) company in the toilet roll production sector faced a critical challenge that threatened their 24/7 production line.
When a food manufacturing site in Kirkcaldy, which holds an impressive BRC AA+ rating, faced a crucial challenge: ensuring that its lubricant usage aligned fully with the BRC Global Standard for Food Safety (Issue 9), they weren’t sure where to turn
When a prominent recycling company that processes medical waste, approached ACORN due to persistent issues with bearing failure, they were determined to prevent persistent unplanned downtime.
A UK-based leader in waste management, who were operating in the energy and manufacturing sector, was managing several single-point lubrication units on their equipment.
After receiving a call from a local quarry in crisis, Craig Tivey, North Branch Manager, jumped into action to get to work, displaying exceptional problem-solving skills as the customer faced a critical machinery breakdown
When a motorsport team were facing recurring issues with the wheel bearings (specifically 6011-2RS) in their track car, they found that the failures were leading to performance setbacks
A large paper manufacturing plant was facing significant operational challenges due to the long lead times and high costs associated with replacing two large FAG 48/1400-B-K30-MB-C3 spherical roller bearings.
A limestone quarry customer thought it would be plain sailing when supplied with a brand-new excavator fitted with a fully automatic lubrication system.
When faced with a critical coupling failure on a Saturday, Phil Mclaughlin sprang into action to get them back up and running.
A local Biomass plant reached out when they urgently needed to change out 1,500 litres of oil, having never previously changed the turbine oil.
Business Development Manager, Craig Tivey received the call Friday afternoon and had the plant up and running with a new custom gearbox by Sunday evening.
Acorn's South West branch were recently able to save a customers repair job by delivering the correct alginment tool within 1 hour.