ACORN® Insight

Keep up-to-date on the latest product and company news, along with useful information for the maintenance, repair and overhaul industry.

Our insight categorised as 'Case studies'

CASE STUDY: A Fast-Track Coupling Solution for Pump Rental Company

When a critical pump was out of action for a leading UK pump rental company, extended downtime meant money lost

CASE STUDY: Chain Solution for Cereal Manufacturer

During a routine visit to a national food manufacturer on the Wirral, Business Development Manager, Lee Dobson was approached by an Engineering Manager regarding a critical issue affecting production

CASE STUDY: Delivering a tailored coupling solution for a leading pump, motor, and gearbox repairer

When a specialist 6" Renold coupling failed, an established pump, motor, and gearbox repairer needed a fast and effective solution to stay ahead of their competitors.

CASE STUDY: Preventing Catastrophic Downtime in 24/7 FMCG Production with Custom Solutions

A leading FMCG (Fast Moving Consumer Goods) company in the toilet roll production sector faced a critical challenge that threatened their 24/7 production line.

CASE STUDY: ACORN Helps Food Manufacturer with Lubrication Compliance

When a food manufacturing site in Kirkcaldy, which holds an impressive BRC AA+ rating, faced a crucial challenge: ensuring that its lubricant usage aligned fully with the BRC Global Standard for Food Safety (Issue 9), they weren’t sure where to turn

CASE STUDY: ACORN Solves Lubrication Woes for Medical Waste Recycling Plant

When a prominent recycling company that processes medical waste, approached ACORN due to persistent issues with bearing failure, they were determined to prevent persistent unplanned downtime.

CASE STUDY: Preventing excess lubricant waste with 8-point solution

A UK-based leader in waste management, who were operating in the energy and manufacturing sector, was managing several single-point lubrication units on their equipment.

CASE STUDY: Rapid response to quarry gearbox failure, ensuring zero downtime.

After receiving a call from a local quarry in crisis, Craig Tivey, North Branch Manager, jumped into action to get to work, displaying exceptional problem-solving skills as the customer faced a critical machinery breakdown

CASE STUDY: ACORN® provides winning solution to motorsport customer

When a motorsport team were facing recurring issues with the wheel bearings (specifically 6011-2RS) in their track car, they found that the failures were leading to performance setbacks

CASE STUDY: Cost and Environmental Savings Through Bearing Refurbishment for Paper Manufacturer

A large paper manufacturing plant was facing significant operational challenges due to the long lead times and high costs associated with replacing two large FAG 48/1400-B-K30-MB-C3 spherical roller bearings.

Categories

Popular tags

View all tags