How a 24-Hour Gearmotor Repair Prevented £6.77 Million in Downtime
See how ACORN's nationwide repair network delivered an emergency gearmotor repair when replacement wasn't an option.
See how ACORN's nationwide repair network delivered an emergency gearmotor repair when replacement wasn't an option.
When a national beverage bottling plant faced a critical breakdown due to an overheating servomotor and gearbox, they were looking at a worst-case scenario, at least a week of downtime and a staggering cost of £10,000 per hour.
When Business Development Manager Jay Goodgame visited a local quarry, he quickly realised an urgent breakdown situation was unfolding at another site nearby. An engineer was struggling to source an SNR bearing at a fair price but with no luck.
When a critical pump was out of action for a leading UK pump rental company, extended downtime meant money lost
During a routine visit to a national food manufacturer on the Wirral, Business Development Manager, Lee Dobson was approached by an Engineering Manager regarding a critical issue affecting production
A leading FMCG (Fast Moving Consumer Goods) company in the toilet roll production sector faced a critical challenge that threatened their 24/7 production line.
When a prominent recycling company that processes medical waste, approached ACORN due to persistent issues with bearing failure, they were determined to prevent persistent unplanned downtime.
When faced with a critical coupling failure on a Saturday, Phil Mclaughlin sprang into action to get them back up and running.
A local Biomass plant reached out when they urgently needed to change out 1,500 litres of oil, having never previously changed the turbine oil.
Business Development Manager, Craig Tivey received the call Friday afternoon and had the plant up and running with a new custom gearbox by Sunday evening.
Acorn's South West branch were recently able to save a customers repair job by delivering the correct alginment tool within 1 hour.
Our Power Transmission Product Manager was able to identify specific belt on a recycling plants wood shredding machine.
Acorn provides value added services that save leading electrical engineers an estimated £23,060.
A local asphalt plant were able to cut their downtime significantly by switching to Timken Type-E TRB Units